Know exactly where your data center stands before a failure tells you

We evaluate the support infrastructure of your critical room against a target level, with engineers accredited by Uptime Institute and specialists in international standards. Without opening switchboards or stopping operations, and with a prioritized action plan at the end.

A data center assessment evaluates the infrastructure that keeps IT equipment operating: power, cooling, fire protection, cabling, physical security, monitoring and operations. At PowerPlus it is led by Eng. Brian Elliott, Accredited Tier Designer and Accredited Operations Professional with Uptime Institute, measured against Uptime Tier and ANSI/TIA-942, and it ends in a report per site with findings, gaps and a prioritized action plan.

Types of assessment

  • Full site assessment: the entire support infrastructure, against a target level.
  • Subsystem assessment: one specific area, for example cooling in the computer room.
  • Colocation assessment: the infrastructure serving your equipment hosted at a third-party site.
  • Pre-project assessment: a survey of what exists, as input to design a new data center or communications room.
  • Gap analysis toward a target Tier: the gaps to reach a certifiable design, for example Tier III, with an action plan and an investment estimate by category.
  • Operations assessment: maintenance, staffing and organization, training and procedures, under Uptime Institute Operational Sustainability.

When it makes sense

  • Before expanding the room, adding racks or bringing in high-density loads such as AI.
  • After an outage or thermal alarms with no clear explanation.
  • When the installation grew in stages and with different contractors, without a unified criterion.
  • Before designing a new site, moving to colocation or tendering equipment.
  • To prepare for a Tier certification or respond to an external audit.

What we review

A full assessment covers ten areas of the support infrastructure. The IT/OT logical layer (servers, data networks, cybersecurity) is out of scope.

  • Site location and risks: design climate, flooding, surrounding fires, seismic risk (INPRES), lightning, airports and transport corridors, adjacent properties and building use.
  • Building and spaces: construction, rooms, access, equipment entry, raised floor, doors and signage.
  • Electrical system: utility service, switchboards, generator set and automatic transfer, UPS and batteries, PDUs, surge protection, grounding and feeder identification.
  • Cooling: capacity and redundancy, heat balance with and without the standby unit, design day, setpoints against ASHRAE, hot and cold aisles and contamination.
  • Fire detection and suppression: NFPA compliance, early detection and automatic clean-agent suppression.
  • Telecommunications and cabling: pathways, fiber routes, administration and labeling per TIA.
  • Physical security: access control and CCTV.
  • DCIM monitoring: monitored variables, alarms and management.
  • Operations and maintenance: maintenance, training, planning and coordination, staffing and organization.
  • Capacity: UPS load and phase balance, battery runtime, thermal capacity and growth red line.

The base service is Class 1, non-invasive: readings from existing instrumentation, portable measurements, document review and interviews. Power quality, grounding measurement, energy efficiency and environmental impact are complementary studies quoted separately and performed with specific, calibrated instruments.

How we evaluate

Each subsystem is evaluated against a target level, and the site level is set by its weakest subsystem. Anything that could not be verified on site is recorded as "Not verified": it is never assumed.

Every finding has its own record: observation, affected requirement, risk and impact, recommendation, photographic evidence with location, and priority.

  • Condition: Excellent, Good, Acceptable, Deficient or Critical.
  • Compliance: Complies, Partially complies, Does not comply or Not applicable.
  • Priority: Critical, High, Medium or Low.

References: Uptime Institute Tier Standard Topology and Operational Sustainability; ANSI/TIA-942-C, TIA-568 and TIA-607; AEA 90364 and IRAM; NFPA 70, 72, 75 and 2001; IEC, IEEE and NEC; ASHRAE TC 9.9; INPRES; ISO and The Green Grid for efficiency.

What you receive

  • A technical report per site with each finding, its condition, its compliance level and its priority.
  • The gap analysis against the target level and the ANSI/TIA-942 compliance comparison table.
  • A capacity analysis with the growth red line.
  • A prioritized remediation plan and, on request, an investment estimate by category.
  • An executive report and a closing presentation for management.

Timeframes depend on the size of what is surveyed: number of sites and rooms, type of assessment and deliverables. We set them in the proposal, after the kickoff meeting.

What we usually find

  • Electrical installations built in stages by different contractors, without a unified criterion.
  • Unidentified feeders and circuits.
  • Incomplete drawings and single-line diagrams: over time and after successive interventions, the documentation stops reflecting the actual installation.
  • Services outside the computer room without redundancy, and no concurrent maintainability against the target Tier.
  • Detection or suppression that does not comply with NFPA, or no automatic suppression.
  • Cooling without effective redundancy, without contained aisles, with contamination or with setpoints outside the recommended envelope.
  • Fiber without dedicated routes and cabling without administration or labeling.
  • Low utilization of installed power together with phase imbalance.
  • Undocumented operations and maintenance procedures.

Who leads it

The assessment is led and signed by Eng. Brian Elliott, Accredited Tier Designer (ATD) and Accredited Operations Professional (AOP) with Uptime Institute, together with Arturo Vottero, Accredited Tier Specialist (ATS), and a critical IT infrastructure specialist with Schneider Electric EcoXpert accreditation. We evaluate equipment from any manufacturer, and our recommendations are brand-neutral.

Methodology

Six stages, without stopping operations

Each stage ends in a verifiable result. We do not open switchboards or operate equipment.

  1. 01

    Kickoff and documents

    Drawings, single-line diagrams, technical reports, maintenance records, procedures and failure history.

  2. 02

    Planning

    Access, escort and permits coordinated with site staff.

  3. 03

    Site survey

    Existing instrumentation, portable measurements, photos by location and interviews.

  4. 04

    Analysis

    Each subsystem against the target level, capacity and red line.

  5. 05

    Reports

    Report per site, gap analysis and prioritized remediation plan.

  6. 06

    Presentation

    Results presented to the technical team and management.

Experience

Some of the assessments we have delivered

Public agencies, banking, healthcare and energy.

01 of 08

Drag the card to either side or use the arrow keys to browse the assessments.

  1. 2016

    Government of the Province of Córdoba

    Provincial public agency Full site + Tier III gap analysis

    Entire data center against Uptime Tier III and ANSI/TIA-942, with an action plan and investment estimate.

  2. 2017

    Government of the Province of San Luis

    Provincial public agency Full site

    Site location, building, electrical system and transfer, cooling, cabling, physical security, grounding, monitoring and operations, against Uptime Tier and international standards.

  3. 2019

    Bancor

    Bank Colocation

    Infrastructure serving the bank’s equipment at a Telecom colocation site.

  4. 2020

    Ecogas

    Energy, gas distribution Pre-project

    Existing facilities, as input to design a new data center and communications room.

  5. 2022

    Hospital Privado de Córdoba

    Healthcare Subsystem

    Precision cooling of the data center.

  6. 2023

    Judiciary of Córdoba

    Provincial judiciary Subsystem

    Cooling of the critical room.

  7. 2024

    Bancor

    Bank Colocation

    Infrastructure serving the bank’s equipment at a Telecom colocation site.

  8. 2025

    Court of Auditors of the Province of Córdoba

    Public oversight agency Subsystem

    Cooling of the critical room.

Case studies

Where we have already applied it

Frequently asked questions

Assessment: frequently asked questions

Can’t find your question?

Does the assessment require stopping operations?

No. We do not open switchboards or operate equipment: we work with existing instrumentation, portable measurements, documents and interviews, coordinated with your staff.

Does PowerPlus certify Tier?

No: Tier certification is granted only by Uptime Institute LLC. Our team, led by our technical representative, Eng. Brian Elliott, performs the assessment and completes the gap analysis against Uptime Institute standards and international regulations. Once the target Tier is reached, it prepares the dossier and carries out the process together with the client before Uptime Institute LLC.

Do you evaluate equipment from other brands?

Yes. We evaluate equipment from any manufacturer, and our recommendations are brand-neutral.

Does it include servers, networks or cybersecurity?

No. The assessment covers the support infrastructure: power, cooling, fire protection, cabling, physical security, monitoring and operations. The IT logical layer is out of scope.

How long does it take?

It depends on the size of what is surveyed: the number of sites and rooms, the type of assessment and the deliverables you need. We set it in the proposal, after the kickoff meeting.

Does it include power quality or grounding studies?

They are complementary studies quoted separately, because they are performed with specific, calibrated instruments and in some cases require intervening in the installation.

Critical infrastructure

Do you know where your data center stands today?

Let’s schedule a kickoff meeting. We will understand your situation and propose the right type of assessment.

New inquiry

Request an assessment of your data center

We survey the availability, risks and efficiency of your room and deliver a prioritized diagnosis with a path toward Tier III.

A specialist will reply within 24 business hours.