Critical infrastructure · Data centers

Data centers that never stop, designed to international standards.

Design, civil works, supply, installation and operation of critical rooms. Uptime Institute–accredited engineering and Schneider Electric authorized service.

  • 99.982%Tier III availability
  • 24/7DCIM monitoring
  • 1Party responsible, end to end

The problem we solve

Continuity can’t be improvised…

Most critical rooms don’t fail only because of poor design, but also because of lack of maintenance, human error and missing advanced monitoring.

  • An outage costs more than the project

    A room going down stops operations, transactions and services. The cost of downtime far exceeds the investment in doing it right.

  • Fragmented suppliers

    Construction on one side, equipment on another, maintenance by a third party. Nobody owns the whole system when something fails.

  • Designs without Tier criteria

    Rooms built without real redundancy or concurrent maintainability, with many single points of failure—hard to operate and impossible to certify.

What PowerPlus offers

The full life cycle, with a single responsible party

From an empty site to a running, monitored room. We don’t pass on responsibility: the whole chain is ours.

Technical scope

Everything that keeps a room from going down

  • Power and backup

    UPS units, battery banks, generator sets, solar energy and automatic transfer switching.

  • Precision cooling

    Cooling for IT rooms, temperature and humidity control and aisle containment. Direct expansion, chilled water, InRow/perimeter, and immersion or direct-to-chip cooling for AI racks.

  • Switchboards and distribution

    Type-tested PrismaSeT/Prisma G/P power switchboards, intelligent PDUs and certified electrical distribution to IEC 61439.

  • DCIM monitoring

    24/7 visibility of power, climate and alarms with Schneider authorized service.

  • Structured cabling

    Pathways, copper and fiber optics for the data center and building network, with every link certified and the installation documented.

  • Software

    Asset integration platforms: a single dashboard consolidating power, climate, access and alarms across the whole infrastructure.

The PowerPlus difference

“We say it because we’ve done it”

We designed and built the data center of the most important provincial bank in Córdoba to Uptime Institute Tier III standards with a view to certification. That project earned us Schneider Electric’s 2021 Full Solution award.

View the full case
Schneider Electric 2021 Full Solution award granted to PowerPlus

Technical authority

Uptime Institute accreditations

PowerPlus has professionals accredited by Uptime Institute LLC, the global authority in data center certification. Our accreditations enable us to design, implement and operate data centers according to the Tier I, II, III and IV standards.

  • Uptime Institute accreditation badge ATD
  • Uptime Institute accreditation badge AOP
  • Uptime Institute accreditation badge ATS

Frequently asked questions

Data centers: frequently asked questions

Can’t find your question?

Do you certify Tier II and III or only design to that standard?

We design and build to Tier II and III standards with a view to certification. Formal certification is granted by Uptime Institute; our accredited team (ATD/AOP/ATS) leaves the site ready to obtain it.

Do you work on existing data centers or only new builds?

Both. We assess operating rooms to detect risks and improvement opportunities, and we also deliver turnkey projects starting from civil works.

What does Schneider / APC authorized service include?

As an Authorized Services Reseller we provide genuine spare parts, preventive and corrective maintenance, and 24/7 remote monitoring of installed Schneider and APC equipment.

Do you only cover Córdoba?

We are based in Córdoba with fast response in the region, but we run projects across Argentina. Remote monitoring has no geographic limit.

How does a project start?

With an assessment. We survey your room or your need, deliver a prioritized diagnosis and a plan, and from there define scope and timelines.

Critical infrastructure

Let’s put your room under engineering criteria

Request an assessment and receive a diagnosis with concrete priorities, with no commitment.

New inquiry

Request an assessment of your data center