Case study · Banking

The data center of the most important provincial bank in Córdoba

A turnkey project—civil works, design, supply, installation and operation—designed to Tier III standards with a view to certification. Awarded by Schneider Electric in 2021 as the best Full Solution project.

  • Tier IIIStandards-based design
  • Turnkey5 integrated stages
  • 2021Full Solution Award

Scope · Turnkey

From the client’s idea to a fully operational room

A single responsible party for the whole chain. Every stage executed and validated by the same engineering team.

  1. 01

    Design

    Electrical and mechanical architecture to Uptime Institute Tier III and ANSI/TIA-942 standards.

  2. 02

    Civil works

    Site preparation, raised floor and containment for a critical room built from scratch.

  3. 03

    Supply

    Genuine Schneider Electric and APC equipment: UPS, switchboards, PDUs and cooling.

  4. 04

    Installation

    Assembly, cabling, integration and commissioning with documented load tests.

  5. 05

    Commissioning

    Integrated tests and verification of maintainability and fault tolerance across all systems.

  6. 06

    Operation

    Authorized service, 24/7 monitoring, generator sets and fire protection system.

Standards-based design

Designed to Uptime Institute standards, with a view to certification

The room was designed to meet Tier III requirements—concurrent maintainability without stopping operations—and the ANSI/TIA-942 standard. The design is ready to move toward formal Uptime Institute certification.

Tier III
Design with 2N redundancy in power, cooling and concurrent maintainability.with a view to certification
ANSI/TIA-942
Data center infrastructure standardICT (Information & Communication Technology) infrastructure
2N
Redundancy in power and coolingno single points of failure
Schneider Electric 2021 Full Solution award

Argentina Award 2021 · Best Full Solution Project, Schneider Electric

The project was recognized by Schneider Electric with the 2021 Full Solution award, which honors the complete integration of solutions—power, cooling, monitoring and services—into a single engineering delivered end to end.

Current operation

We didn’t hand over and leave: we keep operating

The case didn’t end with construction. Today we sustain the room’s continuity with our own facility manager, authorized technical service and advanced monitoring.

Your project

Need a critical room that doesn’t fail?

Let’s start with an assessment. Our team of engineers and specialists is ready to support you.

New inquiry

Request an assessment of your data center