A turnkey project—civil works, design, supply, installation and operation—designed to Tier III standards with a view to certification. Awarded by Schneider Electric in 2021 as the best Full Solution project.

- **Tier III**Standards-based design
- **Turnkey**5 integrated stages
- **2021**Full Solution Award

Scope · Turnkey

## From the client’s idea to a fully operational room

A single responsible party for the whole chain. Every stage executed and validated by the same engineering team.

1. 01

### Design

    Electrical and mechanical architecture to Uptime Institute Tier III and ANSI/TIA-942 standards.
2. 02

### Civil works

    Site preparation, raised floor and containment for a critical room built from scratch.
3. 03

### Supply

    Genuine Schneider Electric and APC equipment: UPS, switchboards, PDUs and cooling.
4. 04

### Installation

    Assembly, cabling, integration and commissioning with documented load tests.
5. 05

### Commissioning

    Integrated tests and verification of maintainability and fault tolerance across all systems.
6. 06

### Operation

    Authorized service, 24/7 monitoring, generator sets and fire protection system.

Standards-based design

## Designed to Uptime Institute standards, with a view to certification

The room was designed to meet **Tier III** requirements—concurrent maintainability without stopping operations—and the **ANSI/TIA-942** standard. The design is ready to move toward formal Uptime Institute certification.

**Tier III**Design with 2N redundancy in power, cooling and concurrent maintainability.with a view to certification

**ANSI/TIA-942**Data center infrastructure standardICT (Information &amp; Communication Technology) infrastructure

**2N**Redundancy in power and coolingno single points of failure

## Argentina Award 2021 · Best Full Solution Project, Schneider Electric

The project was recognized by Schneider Electric with the 2021 Full Solution award, which honors the complete integration of solutions—power, cooling, monitoring and services—into a single engineering delivered end to end.

Current operation

## We didn’t hand over and leave: we keep operating

The case didn’t end with construction. Today we sustain the room’s continuity with our own facility manager, authorized technical service and advanced monitoring.

- 
- 
- 
- 
- 

Your project

## Need a critical room that doesn’t fail?

Let’s start with an assessment. Our team of engineers and specialists is ready to support you.

[Request an assessment ](mailto:ventas@power-plus.com.ar?subject=Request%20an%20assessment) [ WhatsApp](https://wa.me/5493513537584?text=Hello%20PowerPlus%2C%20I%20would%20like%20to%20ask%20about%3A%20Your%20project)